Grimes BTS is the fifth building ACI Mechanical, Inc. has been given the opportunity to work with Cerris Builders to construct. It is a purpose built 215,000 square foot facility designed specifically for a tenant.installations.
ACI was awarded the plumbing portion of the project. The scope of work included underground sanitary systems, trench drains, domestic water, above ground drain, waste and venting, bathroom groups, natural gas piping to roof top equipment, an exterior sand / oil interceptor, condensate drain plumbing, air compressor, compressed air piping, eyewash / shower stations, and water piping to hose reels.
The Grimes BTS development represents another successful partnership between ACI Mechanical, Inc. and Cerris Builders, marking the fifth project the two companies have completed together. The 215,000-square-foot build-to-suit facility was designed to support the operational requirements of a single tenant while allowing for future growth.
ACI Mechanical delivered the plumbing systems for the project, installing key infrastructure including sanitary piping, domestic water distribution, drainage and vent systems, and restroom facilities. The scope also included natural gas piping for rooftop mechanical equipment, condensate drainage, compressed air systems, and safety fixtures such as emergency eyewash and shower stations.
Additional work involved trench drainage, an exterior sand and oil interceptor, and water connections for hose reel stations. The completed building integrates administrative office space, warehouse operations, a fleet maintenance shop, and a wash bay, creating a highly functional facility built to support both current operations and long-term expansion.
System for Air Make-Up Units, showcasing their dedication to holistic solutions. Water piping installations for equipment and labs were also meticulously carried out, reinforcing the mill’s operational prowess for long-term efficiency.