Eight (8) in-floor heating systems were installed to maintain the comfort of Peterbilt’s truck technicians. The project included a quick-lube service bay with a walk beneath the oil pit, for which we had a dedicated exhaust and HVAC system.
8 in-floor heating systems were also installed to maintain comfort for Peterbilt’s truck technicians. A quick-lube service bay with a walk beneath oil pit was included in the project in which we included a dedicated exhaust and HVAC system.
5 BOILERS
2 NATURAL GAS
3 Waste oil
2,400' of hydronic piping.
700’ + OF TRENCHS DRAINS