AMES HIGH SCHOOL
PIPING & HVAC PROJECT

Multi Vent V4 1
Ames High School Logo
ABC Iowa Excellence in Construction Awards
  • Mechanical

     

    ACI Mechanical was involved in the new Ames High School building project. Our engineers, technicians, and administrative staff completed the project on time and within budget, working over two years and 55,000 field hours. 

  • piping

    Working over two years and 55,000 field hours. the project involved fabricating and installing hvac ductwork, chillers, and hydronic piping.

     
     
  • facts

     

    • 10 Mechanical Rooms
    • 5 Chillers / Heaters
    • 5+ Miles of Hydronic Piping
    • 48,000 Gallons 25% Glycol

    • 18 Air Handler Units
    • 8 Energy Recover Units
    • 370 Fan Coil Units
    • 1862 Grilles, Registers & Diffusers

     
     

    The sophisticated chiller/heater system is used to both cool and heat the building. Unlike a typical chiller installation, there is no true condensing & evaporating side. Design Engineers designed the system to utilize the geothermal ground loops to supply both cooling and heating as required. All 3 systems are tied together, ground water, chilled water, and heating water. The 5 chillers/heaters are controlled by demand through the advanced building controls system. 

    Control valves direct the water in the direction it’s needed, and the chillers have a delineation line that determines which units are cooling and which are heating. The system is manipulated by 12 pumps, 3 air separators, 2 heat exchangers, and other hydronic specialties. The heating system also controls the pool water through another set of pumps and heat exchangers. Chilled and heating water is pushed throughout the building to coils in the AHU’s and FCU’s. Finally, spaces in the building are tempered by over 8 miles of ductwork.

    Ryan Greco Business Development 1 1

    Ryan Greco

    Business Development

    Connect directly with our BD team to discuss opportunities, partnerships, and project planning.

    Tell Us About Your Project, Timeline, or Service Needs

    Our business development team will respond promptly.

    Contact our team

    Fill out the form below, and we will be in touch shortly.

    LOGO ACI VECTOR OK BLACK LEETER WHITE 2024