STEAM GEN V1

Peterbilt Truck Service Facility
HVAC Project

Multi Vent V4 1
PETERBILT LOGO
ABC Iowa Excellence in Construction Awards
  • Mechanical

    Eight (8) in-floor heating systems were installed to maintain the comfort of Peterbilt’s truck technicians. The project included a quick-lube service bay with a walk beneath the oil pit, for which we had a dedicated exhaust and HVAC system.

  • plumbing

    8 in-floor heating systems were also installed to maintain comfort for Peterbilt’s truck technicians. A quick-lube service bay with a walk beneath oil pit was included in the project in which we included a dedicated exhaust and HVAC system.

  • hvac

    • Eight (8) Roof Top Units (RTU)
    • 14 Variable Air Volume (VAV)
    • 56,000 Square feet Building
  • Quick facts

    5 BOILERS

    2 NATURAL GAS

    3 Waste oil

    2,400' of hydronic piping.

    700’ + OF TRENCHS DRAINS

    Ryan Greco Business Development 1 1

    Ryan Greco

    Business Development

    Connect directly with our BD team to discuss opportunities, partnerships, and project planning.

    Tell Us About Your Project, Timeline, or Service Needs

    Our business development team will respond promptly.

    Contact our team

    Fill out the form below, and we will be in touch shortly.

    LOGO ACI VECTOR OK BLACK LEETER WHITE 2024